U.S. 641 Phase 2 relocation materials available --classifieds

مواضيع مفضلة

الخميس، 14 نوفمبر 2019

U.S. 641 Phase 2 relocation materials available --classifieds

The Kentucky Transportation Cabinet's public meeting on the future of U.S. 641 between Fredonia and Eddyville was last month, but materials from that meeting can still be downloaded from The  Press Online. Materials include a two-page project overview, a seven-question survey and full-size map of the preliminary preferred alternative route for a relocated U.S. 641 in Caldwell and Lyon counties, the second phase of the overall Marion-to-Eddyville project. These are the same materials made available to the public at the Aug. 27 meeting in Fredonia.

Click on the links below to download the respective document:

  • روابط التحميل والمشاهدة، الروابط المباشرة للتحميل من هنا
---------------------------------------------------------------
شاهد هذا الفيديو القصير لطريقة التحميل البسيطة من هنا
كيف تحصل على مدونة جاهزة بآلاف المواضيع والمشاركات من هنا شاهد قناة منتدى مدونات بلوجر جاهزة بألاف المواضيع والمشاركات على اليوتيوب لمزيد من الشرح من هنا رابط مدونة منتدى مدونات بلوجر جاهزة بآلاف المواضيع والمشاركات في أي وقت حــــتى لو تم حذفها من هنا شاهد صفحة منتدى مدونات بلوجر جاهزة بألاف المواضيع والمشاركات على الفيس بوك لمزيد من الشرح من هنا تعرف على ترتيب مواضيع منتدى مدونات بلوجر جاهزة بآلاف المواضيع والمشاركات (حتى لا تختلط عليك الامور) من هنا
ملاحظة هامة: كل عمليات تنزيل، رفع، وتعديل المواضيع الجاهزة تتم بطريقة آلية، ونعتذر عن اي موضوع مخالف او مخل بالحياء مرفوع بالمدونات الجاهزة بآلاف المواضيع والمشاركات، ولكم ان تقوموا بحذف هذه المواضيع والمشاركات والطريقة بسيطة وسهلة. ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــسلامـ.

إرسال تعليق

المشاركة على واتساب متوفرة فقط في الهواتف