U.S. 60 bridge at Cairo closed Aug. 20-22 --classifieds

مواضيع مفضلة

الخميس، 14 نوفمبر 2019

U.S. 60 bridge at Cairo closed Aug. 20-22 --classifieds


The Illinois Department of Transportation is alerting motorists traveling in the Cairo area that the U.S. 60/62 bridge over the Mississippi River will be closed for three days this month. 

The closure is scheduled to begin on Monday, August 20 and will extend through Wednesday, August 22.  The closure will be effective during the hours of 7 a.m. to 5 p.m. daily.

Also, the bridge will be restricted to one lane during daylight hours from Thursday, August 23 to Friday, August 31.

Crews will be performing required safety inspection of the structure.

  • روابط التحميل والمشاهدة، الروابط المباشرة للتحميل من هنا
---------------------------------------------------------------
شاهد هذا الفيديو القصير لطريقة التحميل البسيطة من هنا
كيف تحصل على مدونة جاهزة بآلاف المواضيع والمشاركات من هنا شاهد قناة منتدى مدونات بلوجر جاهزة بألاف المواضيع والمشاركات على اليوتيوب لمزيد من الشرح من هنا رابط مدونة منتدى مدونات بلوجر جاهزة بآلاف المواضيع والمشاركات في أي وقت حــــتى لو تم حذفها من هنا شاهد صفحة منتدى مدونات بلوجر جاهزة بألاف المواضيع والمشاركات على الفيس بوك لمزيد من الشرح من هنا تعرف على ترتيب مواضيع منتدى مدونات بلوجر جاهزة بآلاف المواضيع والمشاركات (حتى لا تختلط عليك الامور) من هنا
ملاحظة هامة: كل عمليات تنزيل، رفع، وتعديل المواضيع الجاهزة تتم بطريقة آلية، ونعتذر عن اي موضوع مخالف او مخل بالحياء مرفوع بالمدونات الجاهزة بآلاف المواضيع والمشاركات، ولكم ان تقوموا بحذف هذه المواضيع والمشاركات والطريقة بسيطة وسهلة. ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــسلامـ.

إرسال تعليق

المشاركة على واتساب متوفرة فقط في الهواتف